Charlotte data center market

Power availability in Charlotte: DCPI verdict AVOID, composite score 30.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 281 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score30.2/100
MW, all listings16sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Charlotte at a glance

Charlotte has 16 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Flexential (8 MW) and T5 (8 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational16
Total listed16

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Charlotte

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Charlotte-Raleigh (combined market) (figure on paid plans) (link)

No recent deal activity has been recorded in the market.

Together, these scores suggest that operators pursuing expansion or new builds will face elevated lead times and potentially higher costs to source and interconnect new power supply. The combination does not reflect demand weakness but rather a mismatch between available grid capacity and site-level appetite for additional megawatts.

Operator consolidation is concentrated among regional and national players. Flexential's nine-site footprint establishes it as the dominant operator by facility count, though the aggregate 16 MW base remains modest relative to major U.S. metros. In adjacent North Carolina markets, WhiteFiber announced acquisition of two development-stage sites in late 2025, indicating that greenfield and repositioning activity continues in the state, though not visibly in Charlotte's tracked set.

Power infrastructure development remains the limiting variable for growth. Any material acceleration in Charlotte capacity will likely depend on whether utility-scale power additions—whether through grid reinforcement, generation capacity, or distributed supply agreements—can narrow the gap between buildable MW and grid availability.

Data centers in Charlotte

FacilityOperatorStatusMW
Flexential CharlotteFlexentialOperational8
T5@CharlotteT5Operational8
CENTRA CLT01 - Charlotte NC (701 E Trade)CENTRA Digital InterconnectOperational
Carolina Internet / CaroNetCaroNetOperational
Carolina Internet / CaroNet XBCaroNetOperational
Cogent CharlotteCogent Communications, Inc.Operational
Cogent Charlotte 2Cogent Communications, Inc.Operational
Digital Realty CLT (113 N Myers St)Digital RealtyOperational
Digital Realty CLT (125 N Myers St)Digital RealtyOperational
Flexential - Charlotte/North (CLT4/5)Flexential Corp.Operational
Flexential - Charlotte/South (CLT1/2/3)Flexential Corp.Operational
Flexential Charlotte - SouthFlexentialOperational
Level(3) CharlotteLumen TechnologiesOperational
Spectrum Charlotte National Data CenterOperational
TierPoint Charlotte - Center ParkTierPoint, LLCOperational
TierPoint Charlotte - North MyersTierPoint, LLCOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in North Carolina.

More on Charlotte

Email me when the Charlotte DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Charlotte: 16 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/charlotte/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load