Byron Center data center market

Power availability in Byron Center: DCPI verdict CAUTION, composite score 47.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 205 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score47.2/100
MW, all listings0any status, unverified listings included
VerdictCAUTION

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 47.0. The index is recomputed through the day and reads 47.2 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

Colocation lease rates in Byron Center

DC Hub does not hold a lease-rate figure for this market yet.

Byron Center's data center footprint comprises three tracked facilities operated by 123.Net, ManagedWay Company, and US Signal, with no recent deal activity on record. These conditions yield a CAUTION verdict, meaning new power procurement here carries material headwind.

The DCPI verdict reflects a structural tension: power exists, but reaching it requires navigation of grid access limitations. New capacity additions will face non-trivial lead times and coordination costs to unlock available generation. This is distinct from markets with acute scarcity—Byron Center has supply—but distinct also from markets with open access.

The absence of deal flow in Byron Center does not reflect demand weakness; it reflects the current state of tracked transaction activity in this specific market.

Data centers in Byron Center

FacilityOperatorStatusMW
123.NET - DC4 - 400 76th St SW123.Net, LLC.Operational
ManagedWay BYK1ManagedWay CompanyOperational
US Signal - Grand Rapids SouthUS SignalOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Michigan.

More on Byron Center

Email me when the Byron Center DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Byron Center market data is live in DC Hub — cited and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/byron-center/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load