Bristow data center market

Power availability in Bristow: DCPI verdict AVOID, composite score 21.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 200 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score21.1/100
MW, all listings374sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Bristow at a glance

Bristow has 14 MW operational and 360 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Compass Datacenters (300 MW), Yondr Group (60 MW) and Digital Realty (14 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational14
Under construction360
Total listed374

Developers building or planning in Bristow

OperatorUnder construction MWPlanned MW
Compass Datacenters300
Yondr Group60

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Bristow

DC Hub does not hold a lease-rate figure for this market yet.

Digital Realty operates two facilities in the market, while Google, Microsoft, NOVA MANGO FARMS LLC, and Yondr Group each operate one. The operator base reflects a mix of hyperscale entrants and specialized infrastructure providers, with no single entity dominating the footprint.

No recent deals have been tracked in Bristow.

Data centers in Bristow

FacilityOperatorStatusMW
Compass Datacenters Prince William County VACompass DatacentersUnder Construction300
Yondr Bristow VA CampusYondr GroupUnder Construction60
VA 4Digital RealtyOperational14

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Virginia.

More on Bristow

Email me when the Bristow DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Bristow: 374 MW tracked, any status — live, cited, and queryable by API or MCP.