Boydton data center market

Power availability in Boydton: DCPI verdict AVOID, composite score 21 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 197 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score21.0/100
MW, all listings500sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Boydton at a glance

Boydton has 500 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (500 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational500
Total listed500

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Boydton

DC Hub does not hold a lease-rate figure for this market yet.

Boydton's data center footprint is dominated by Microsoft, which operates eight facilities across the market alongside three additional named Microsoft entities. Thirteen facilities are currently tracked in the registry. The operator base shows heavy concentration, with Microsoft accounting for the majority of identified sites in this rural Virginia locality.

Together, these scores indicate that procuring new power commitments for additional capacity will face material headwinds from both supply scarcity and infrastructure limitations.

No recent deals have been tracked in Boydton's transaction registry, leaving current operator expansion plans and investment signals opaque. The market's heavy Microsoft weighting means operator dynamics are effectively tied to a single player's deployment cadence. Without visible M&A flow, facility transactions, or announced expansions, the trajectory of capacity growth—whether from existing operator investment or new entrant acquisition—remains unclear.

Data centers in Boydton

FacilityOperatorStatusMW
Microsoft Azure East US (Virginia)MicrosoftOperational500
Azure East US VirginiaMicrosoftOperational
MICROSOFT CORP - LVL DATA CENTERMicrosoft
MICROSOFT CORP - LYH10 DATACENTERMicrosoft
MICROSOFT CORPORATION - EAST COAST DATA CENTERMicrosoft
MICROSOFT CORPORATION - TIMBER DATA CENTERMicrosoft
Microsoft Boydton Data CenterMicrosoftOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Virginia.

More on Boydton

Email me when the Boydton DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Boydton: 500 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/boydton/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load