Aurora data center market

Power availability in Aurora: DCPI verdict AVOID, composite score 19.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score19.4/100
MW, all listings165sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Aurora at a glance

Aurora has 30 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are CME Group (30 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational30
Total listed30

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Aurora

DC Hub does not hold a lease-rate figure for this market yet.

CyrusOne dominates operator presence with nine tracked listings in the market. Regional context includes ongoing municipal scrutiny—Aurora's city council has moved to establish new data center restrictions and actively solicited resident feedback on facility development, signaling heightened governance around expansion.

This pairing means that incremental megawatts will require either substantial infrastructure upgrades to the local grid or long-term power agreements secured well ahead of project commissioning. Operators and developers should expect extended timelines for power tie-in approvals and potentially higher costs to underwrite grid reinforcement.

No recent deals have been tracked in Aurora, leaving operator dynamics static. A parallel Illinois market, Oak Brook, shows similarly dormant deal activity, suggesting that capital and development momentum across Illinois data center markets may be concentrated elsewhere. The absence of transaction data does not indicate demand weakness; rather, it reflects a market in a holding pattern pending power infrastructure resolution.

Public debate over zoning and resident concerns around data center noise and utility costs will likely shape the pace at which new power infrastructure can be planned and permitted in Aurora.

Data centers in Aurora

FacilityOperatorStatusMW
CME Group Data CenterCME GroupOperational30
Aurora, IL, CHI1-CHI3CyrusOneOperational
CyrusOne Aurora ICyrusOne Inc.Operational
CyrusOne Chicago Aurora CMECyrusOneOperational
DataBridge Sites AuroraDataBridge SitesOperational
Edged Chicago ORD01EdgedOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Illinois.

More on Aurora

Email me when the Aurora DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Aurora: 165 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/aurora/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load