Power availability in Abilene: DCPI verdict CAUTION, composite score 42.7 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 199 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Abilene has 150 MW operational and 1,200 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Stargate (OpenAI/SoftBank/Oracle) (1,200 MW) and Lancium (150 MW).
| Status | MW |
|---|---|
| Operational | 150 |
| Under construction | 1,200 |
| Total listed | 1,350 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Stargate (OpenAI/SoftBank/Oracle) | 1,200 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Abilene's data center footprint spans 1,950 MW across five tracked facilities, anchored by hyperscaler and specialized compute operators. LONGHORN DATA CENTER, Lancium, Oracle/OpenAI, and the Stargate project (OpenAI/SoftBank/Oracle) represent the operator base, with no recent deal activity recorded in the tracked period.
The DCPI verdict of CAUTION reflects a balanced but tightening supply outlook. Operators pursuing capacity additions should expect deliberate grid coordination and may face capacity reservation requirements that exceed typical regional baselines.
Operator composition reflects heavy concentration among hyperscalers and AI-focused compute platforms. The presence of four distinct operators across 1,950 MW indicates fragmentation compared to markets dominated by single-operator campuses, though the Stargate project's scale potential could reshape this distribution. The operator roster suggests demand persistence for both GPU-intensive and general compute capacity.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Stargate Abilene Phase 1 | Stargate (OpenAI/SoftBank/Oracle) | Under Construction | 1,200 |
| Lancium Abilene | Lancium | Operational | 150 |
| LONGHORN DATA CENTER |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Texas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Abilene: 1,950 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/abilene/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load