Verizon Wireless Mew Building

Verizon Wireless Mew Building is a data center in Grapevine, TX, US. The facility is currently operational.

Status
Operational
Market
Grapevine
State
TX
Country
US

Source: OpenStreetMap · Verified against OpenStreetMap · Basis: cited (what this means)

Market intelligence

CAUTION

Fort Worth

Power outlook → Fort Worth market page →

Market context

Verizon Wireless Mew Building is one of 20 facilities DC Hub’s Fort Worth brief counts on the ERCOT grid. The closest tracked facility is Rackspace Dallas Grapevine (DFW1), about 7 km away, and the nearest mapped substation is within 5 km. Read the Fort Worth market brief →

Location

Area Grapevine, TX, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationGrapevine, US
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 18 operating generating units totalling 3,059 MW within about 50 km of Grapevine, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,520 MW · 9 units · 82%
Utility-Scale Solar540 MW · 9 units · 18%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="verizon-wireless-mew-building-verizon-wireless-mew-building-e080c6f7" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind