Applied Digital Ellendale Campus is a data center operated by Applied Digital in Ellendale, ND, US. Its reported power capacity falls in the 100–500 MW range and it is currently operational.
Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)
Applied Digital Ellendale Campus is one of 5 facilities DC Hub’s Ellendale brief counts on the MISO grid. The closest tracked facility is Applied Digital / Ellendale Data Center, about 3 km away, and the nearest mapped substation is within 1 km. Read the Ellendale market brief →
Published DC Hub data for this location.
DC Hub tracks 6 operating generating units totalling 541 MW within about 50 km of Ellendale, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.