Market Brief · CAUTIONDCPI score pending · Live as of 88% live coverage · 7/8 sections
| Operator | Facility | Power | Status | ETA |
|---|---|---|---|---|
| Compass Datacenters | Compass Goodyear Campus (Phoenix) | 212 MW | Under Construction | Not tracked |
| Novva Data Centers | Novva Project Borealis Phase 1 | 96 MW | Under Construction | Not tracked |
| STACK Infrastructure | STACK Phoenix Campus | 80 MW | Under Construction | Not tracked |
| EdgeCore Digital Infrastructure | EdgeCore Mesa Campus PH03 | 72 MW | Under Construction | Not tracked |
| EdgeCore Digital Infrastructure | EdgeCore Mesa Campus PH02 | 72 MW | Under Construction | Not tracked |
| H5 Data Centers | H5 Chandler 2 | 50 MW | Under Construction | Not tracked |
| Novva Data Centers | Novva Phoenix | 30 MW | Under Construction | Not tracked |
| Thor Equities | Thor Phoenix 1 | 25 MW | Under Construction | Not tracked |
| Novva Data Centers | Novva Mesa Campus | Not tracked | Under Construction | Not tracked |
| Arcadian Infracom | Arcadian Infracom Phoenix PoP | Not tracked | Under Construction | Not tracked |
| Operator | Facilities | Total MW |
|---|---|---|
| CyrusOne | 11 | 210 MW |
| Vantage Data Centers | 7 | 539 MW |
| Digital Realty | 6 | 0 MW |
| Aligned | 5 | 780 MW |
| Iron Mountain | 5 | 0 MW |
| Date | Buyer | Seller | Value | MW |
|---|---|---|---|---|
| 2026-03-12 | RadiusDC | PhoenixNAP | Not tracked | Not tracked |
Phoenix operates 246 tracked facilities across 4,323 MW, making it a mature regional hub anchored by three operators: CyrusOne (11 facilities), Vantage Data Centers (7), and Digital Realty (6). The market spans operational, under-construction, and planned assets, reflecting both legacy infrastructure and ongoing expansion. Recent M&A activity includes RadiusDC's acquisition of PhoenixNAP's Phoenix data center and colocation business, announced March 12, 2026.
This combination reflects a market where available capacity exists but faces meaningful delivery obstacles. Projects seeking grid access should anticipate friction in the interconnection timeline and availability windows, though neither metric reaches critical thresholds that would prevent new supply contracts outright.
The RadiusDC transaction represents active operator repositioning in Phoenix's colocation and wholesale segments. CyrusOne's 11-facility footprint and Vantage's 7-facility presence indicate that scale-focused operators have already staked material positions; fragmentation remains lower than peer Arizona markets like Scottsdale. Deal flow, while not prolific, underscores that Phoenix retains operational interest from mid-tier and larger platforms willing to acquire or invest in existing assets and capabilities.