Stargate Ohio Campus is a data center operated by Stargate (OpenAI/SoftBank/Oracle) in Columbus, OH, US. Its reported power capacity falls in the 500 MW–1 GW range and it is currently planned.
Source: industry news · Added , not re-checked since · Basis: cited (what this means)
Stargate Ohio Campus is one of 112 facilities DC Hub’s Columbus brief counts on the PJM grid. The closest tracked facility is 180 E Broad St., under 1 km away, and the nearest mapped substation is within 1 km. Read the Columbus market brief →
Published DC Hub data for this location.
Networks recorded as present at or immediately around Stargate Ohio Campus in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Further networks are recorded at this location beyond those listed here.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 14 operating generating units totalling 1,524 MW within about 50 km of Columbus, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="stargate-openaisoftbankoracle-stargate-ohio-campus-acf2f8da" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: