Austria Campus is a data center operated by SIGNA REM Transactions GmbH in Vienna, AT. The facility is currently operational.
Source: PeeringDB · Verified against PeeringDB · Basis: cited (what this means)
SIGNA REM Transactions GmbH Austria Campus is one of 107 facilities DC Hub’s Vienna brief counts on the ENTSOE-AT grid. The closest tracked facility is next layer Fleischmarkt, about 1 km away. Read the Vienna market brief →
Published DC Hub data for this location.
DC Hub tracks 169 operating generating units totalling 5,633 MW within about 50 km of Vienna, AT. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="signa-rem-transactions-gmbh-austria-campus-9ac1dc8a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect