Novva Project Borealis Phase 1

Novva Project Borealis Phase 1 is a data center operated by Novva Data Centers in Mesa, AZ, US. Its reported power capacity falls in the 50–100 MW range and it is currently under construction.

Power
50–100 MW
Status
Under Construction
Market
Phoenix
City
Mesa
State
AZ
Country
US

Source: industry news · Added , not re-checked since · Basis: cited (what this means)

Market intelligence

BUILD

Mesa

Power outlook → Mesa market page →

Market context

Novva Project Borealis Phase 1 is one of 53 facilities DC Hub’s Mesa brief counts on the WECC grid. The closest tracked facility is Apple Mesa AZ Campus, under 1 km away, and the nearest mapped substation is within 1 km. Read the Mesa market brief →

Location

Area Mesa, AZ, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationMesa, US
Reported capacity50–100 MW
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 57 operating generating units totalling 5,442 MW within about 50 km of Mesa, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,731 MW · 34 units · 87%
Utility-Scale Solar464 MW · 19 units · 9%
Hydropower248 MW · 4 units · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="novva-data-centers-novva-project-borealis-phase-1-b446777d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind