Lumen Technologies Level(3) Austin (Kramer)

Level(3) Austin (Kramer) is a data center operated by Lumen Technologies in Austin, TX, US. The facility is currently operational.

Status
Operational
Market
Austin
State
TX
Country
US

Source: PeeringDB · Verified against PeeringDB · Basis: cited (what this means)

Market intelligence

CAUTION

Austin

Power outlook → Austin market page →

Market context

Lumen Technologies Level(3) Austin (Kramer) is one of 89 facilities DC Hub’s Austin brief counts on the ERCOT grid. The closest tracked facility is Element Critical, about 6 km away, and the nearest mapped substation is within 5 km. Read the Austin market brief →

Location

Area Austin, TX, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationAustin, US
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 26 operating generating units totalling 3,155 MW within about 50 km of Austin, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,863 MW · 17 units · 91%
Utility-Scale Solar184 MW · 8 units · 6%
Hydropower108 MW · 1 unit · 3%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="lumen-technologies-level3-austin-kramer-a8a17efc" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind