EdgeCore Culpeper Campus

EdgeCore Culpeper Campus is a data center operated by EdgeCore Digital Infrastructure in Culpeper, VA, US. Its reported power capacity falls in the 100–500 MW range and it is currently under construction.

Power
100–500 MW
Status
Under Construction
Market
Culpeper
State
VA
Country
US

Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)

Market intelligence

AVOID

Culpeper

Power outlook → Culpeper market page →

Market context

EdgeCore Culpeper Campus is one of 6 facilities DC Hub’s Culpeper brief counts on the PJM grid. The closest tracked facility is EQUINIX, LLC - CU 1-4, about 2 km away, and the nearest mapped substation is within 1 km. Read the Culpeper market brief →

Location

Area Culpeper, VA, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationCulpeper, US
Reported capacity100–500 MW
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 35 operating generating units totalling 6,158 MW within about 50 km of Culpeper, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,401 MW · 22 units · 55%
Nuclear2,001 MW · 2 units · 32%
Utility-Scale Solar756 MW · 11 units · 12%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgecore-digital-infrastructure-edgecore-culpeper-campus-c11062c2" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind