CMH072 CAMPUS

Last updated

CMH072 CAMPUS is a data center in HILLIARD, OH, US. The facility is currently operational.

Status
Operational
City
HILLIARD
State
OH
Country
US

Source: DC Hub facilities registry · Last changed , not re-checked since · Basis: cited (what this means)

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Columbus

Power outlook → Columbus market page →

Market context

CMH072 CAMPUS is one of 112 facilities DC Hub’s Columbus brief counts on the PJM grid. The closest tracked facility is CMH091 CAMPUS, about 3 km away. Read the Columbus market brief →

Location

Street SCIOTO DARBY CREEK RD
Area HILLIARD, OH, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationHILLIARD, US

Power generation nearby

DC Hub tracks 14 operating generating units totalling 1,847 MW within about 50 km of HILLIARD, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar1,283 MW · 8 units · 69%
Oil/Gas564 MW · 6 units · 31%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cmh072-campus-89b0b220" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind