{"generated_at": "2026-11-07T09:31:39.521675+00:00", "key_stats": {"computed": "2026-11-07T08:49:14.582506+00:00", "constraint": null, "dcpi_score": 19.2, "excess": null, "facility_count": 107, "mw_reporting_count": 0, "name": "Vienna", "recent_deals": [], "slug": "vienna", "state": "AT", "top_operators": [{"count": 6, "name": "Digital Realty"}, {"count": 5, "name": ""}, {"count": 3, "name": "Raiffeisen Informatik GmbH & Co KG"}, {"count": 3, "name": "Equinix"}, {"count": 2, "name": "AtlasEdge"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Vienna", "narrative_md": "# Vienna Data Center Market Brief\n\nVienna's data center footprint comprises 107 tracked facilities managed by a concentrated operator base, with Digital Realty leading at six sites, followed by Raiffeisen Informatik GmbH & Co KG and Equinix at three sites each. The market shows limited recent transaction activity, with no deals recorded in the tracked window. The operator landscape includes secondary players such as AtlasEdge, which operates two facilities in the region.\n\nThe combination suggests that operators planning brownfield or greenfield expansion should anticipate extended lead times for power allocation and elevated coordination requirements with local grid operators. This is not a statement about market demand or facility quality, but rather a signal about the logistics and cost profile of sourcing new supply.\n\nDeal flow in Vienna has stalled, with zero transactions tracked in the recent window. The top three operators\u2014Digital Realty, Raiffeisen Informatik, and Equinix\u2014collectively operate 12 of the 107 tracked sites, leaving 95 facilities distributed among smaller operators or single-site players.", "slug": "vienna", "word_count": 259, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}