{"generated_at": "2026-11-07T09:31:16.916486+00:00", "key_stats": {"computed": "2026-11-07T08:49:08.937273+00:00", "constraint": null, "dcpi_score": 65.1, "excess": null, "facility_count": 25, "mw_reporting_count": 1, "name": "Tulsa", "recent_deals": [], "slug": "tulsa", "state": "OK", "top_operators": [{"count": 4, "name": "TierPoint"}, {"count": 4, "name": "Unknown"}, {"count": 2, "name": ""}, {"count": 2, "name": "TierPoint, LLC"}, {"count": 1, "name": "Compass Datacenters Tulsa I"}], "total_mw": 4.0, "verdict": "BUILD"}, "model": "claude-haiku-4-5", "name": "Tulsa", "narrative_md": "# Tulsa Data Center Market Brief\n\nTulsa's data center ecosystem comprises 25 tracked facilities operated primarily by TierPoint, which runs 6 locations across the market. The operator base remains concentrated, with TierPoint holding the plurality of sites and Compass Datacenters Tulsa I representing a secondary footprint. Only one tracked facility publicly reports megawatt capacity, limiting visibility into aggregate market scale. The market shows a fragmented real estate profile typical of secondary metros, with room for additional infrastructure deployment.\n\nThis configuration signals that new power procurement remains viable, though not frictionless.\n\nDeal flow in Tulsa has been quiet; no recent transactions have been tracked in the market. TierPoint's existing four-facility and two-facility clusters represent the dominant operator presence by count, though without reported capacity figures it remains unclear whether these sites represent a concentrated power footprint or distributed loads. The absence of recent M&A activity does not signal market dysfunction\u2014secondary markets frequently see sustained operational presence without constant transaction velocity. Compass Datacenters' single tracked site provides a secondary operator anchor, establishing baseline competitive structure.\n\nTulsa's power environment supports greenfield and expansion activity at moderate risk, contingent on site-specific utility relationships and interconnection timelines typical of the region.", "slug": "tulsa", "word_count": 279, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}