{"generated_at": "2026-11-07T09:30:07.602916+00:00", "key_stats": {"computed": "2026-11-07T08:49:47.882203+00:00", "constraint": null, "dcpi_score": 69.2, "excess": null, "facility_count": 11, "mw_reporting_count": 0, "name": "Tempe", "recent_deals": [], "slug": "tempe", "state": "AZ", "top_operators": [{"count": 3, "name": "Unknown"}, {"count": 2, "name": "EdgeConneX"}, {"count": 1, "name": "EdgeConneX Inc."}, {"count": 1, "name": "Alembic Computer Services, Inc."}, {"count": 1, "name": "Omnis Network"}], "total_mw": 0.0, "verdict": "BUILD"}, "model": "claude-haiku-4-5", "name": "Tempe", "narrative_md": "# Tempe Data Center Market Brief\n\nTempe's tracked data center ecosystem comprises 11 facilities operated by a small cohort of regional players. EdgeConneX operates two sites in the market, while Alembic Computer Services, Inc., Omnis Network, and EdgeConneX Inc. each operate single facilities. No recent deals have been tracked in Tempe, and only one operator has submitted power consumption data to DC Hub's monitoring network. The fragmented operator base and limited reporting suggest a market still establishing its data center infrastructure footprint.\n\nThis combination signals that new power supply is accessible relative to current demand\u2014a rare configuration.\n\nOperator concentration in Tempe is light. EdgeConneX's presence across three tracked entities (two standalone facilities and one under EdgeConneX Inc.) represents the largest single operator footprint, but no dominant platform has emerged. The absence of tracked M&A activity into Tempe contrasts with the consolidation wave visible in nearby Phoenix and broader Southwest markets, where regional acquisitions have reshuffled operator rosters.\n\nPower availability positions Tempe as a viable greenfield market for new site development, particularly for operators seeking grid access without competing for scarce utility capacity.", "slug": "tempe", "word_count": 263, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}