{"generated_at": "2026-11-07T09:29:58.723235+00:00", "key_stats": {"computed": "2026-11-07T08:49:02.021384+00:00", "constraint": null, "dcpi_score": 30.4, "excess": null, "facility_count": 45, "mw_reporting_count": 2, "name": "Tampa", "recent_deals": [], "slug": "tampa", "state": "FL", "top_operators": [{"count": 7, "name": "Flexential"}, {"count": 5, "name": "Frontier Tampa"}, {"count": 3, "name": "365 Data Centers"}, {"count": 2, "name": "Flexential Corp."}, {"count": 1, "name": "Carrier Core, LLC"}], "total_mw": 18.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Tampa", "narrative_md": "# Tampa Data Center Market Brief\n\nTampa's data center footprint spans 45 tracked facilities totaling 18 MW across operational, under-construction, and planned sites. Flexential operates the largest presence with 7 facilities, followed by Frontier Tampa with 5 sites and 365 Data Centers with 3 locations. The market remains fragmented, with no single operator commanding dominant capacity share. No recent deals have been tracked in this market during the current reporting window.\n\nThis combination\u2014idle capacity coupled with procurement barriers\u2014suggests that new power infrastructure expansion will face headwinds from both grid access limitations and the need to rationalize existing supply before adding incremental load.\n\nOperator concentration remains modest. Beyond Flexential's 7-facility footprint, no single entity manages more than 5 sites, indicating a distributed market structure. Carrier Core operates a single tracked facility, while Flexential Corp maintains 2 additional locations separate from the primary Flexential portfolio.\n\nThe Tampa market's power trajectory will depend on whether grid infrastructure investment can match incremental demand from the broader Southeast data center build cycle currently visible in neighboring markets.", "slug": "tampa", "word_count": 237, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}