{"generated_at": "2026-11-07T09:29:50.847413+00:00", "key_stats": {"computed": "2026-11-07T08:49:27.436490+00:00", "constraint": null, "dcpi_score": 18.5, "excess": null, "facility_count": 51, "mw_reporting_count": 1, "name": "Taipei", "recent_deals": [], "slug": "taipei", "state": "TW", "top_operators": [{"count": 4, "name": "Unknown"}, {"count": 3, "name": "Chief Telecom Inc."}, {"count": 3, "name": ""}, {"count": 2, "name": "Chunghwa Telecom Co., Ltd."}, {"count": 2, "name": "Chunghwa Telecom"}], "total_mw": 7.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Taipei", "narrative_md": "# Taipei Data Center Market Brief\n\nTaipei's tracked market spans 51 facilities with a fragmented operator base dominated by Chief Telecom Inc. (3 sites) and two entries for Chunghwa Telecom Co., Ltd. and Chunghwa Telecom (2 sites each). Power reporting remains opaque: only one tracked site discloses megawatt capacity, precluding any reliable estimate of total installed or available power across the market. Empyrion's 7 MW data center financing closure via E.Sun Bank confirms active facility deployment, yet the broader supply picture lacks transparency. The region's three largest operators control 7 of 51 tracked sites, indicating high concentration among incumbents.\n\nThis combination indicates that securing incremental power capacity for new or expanded facilities will face material headwinds\u2014both in absolute supply and in procurement complexity.\n\nRecent deal activity tracked for Taipei shows no recorded transactions, a gap that contrasts sharply with activity in neighboring APAC markets.\n\nTaipei's trajectory depends on whether grid infrastructure and power supply expand to unlock the latent demand signaled by major technology vendor commitments to Taiwan.", "slug": "taipei", "word_count": 260, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}