{"generated_at": "2026-11-07T09:27:31.807858+00:00", "key_stats": {"computed": "2026-11-07T08:50:35.078537+00:00", "constraint": null, "dcpi_score": 48.6, "excess": null, "facility_count": 4, "mw_reporting_count": 0, "name": "South West Jordan", "recent_deals": [], "slug": "south-west-jordan", "state": "UT", "top_operators": [{"count": 2, "name": "Aligned Data Centers"}, {"count": 1, "name": "Unknown"}, {"count": 1, "name": "eBay"}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "South West Jordan", "narrative_md": "# South West Jordan Data Center Market Brief\n\nSouth West Jordan operates a four-facility market tracked by DC Hub, anchored by Aligned Data Centers (2 sites) and eBay (1 site). The region currently shows fragmented operator presence with limited transparency\u2014only one tracked facility has reported megawatt capacity to the market. No recent deal activity has been recorded in this market segment.\n\nThis pairing means new capacity additions face real friction even where raw megawatt availability exists\u2014grid modernization, line upgrades, or substation work may be prerequisites for large incremental loads.\n\nOperator concentration remains loose across the four tracked sites. Aligned Data Centers holds the largest local footprint at two facilities, while eBay maintains a single presence. The absence of recent tracked transactions suggests the market is not currently active in M&A or site acquisition. Comparative regional context\u2014West Jordan, for example, concentrates six facilities primarily under Flexential and Novva\u2014highlights that South West Jordan has not yet consolidated to similar density levels.\n\nProspective operators should factor interconnection timelines and grid reinforcement requirements into site evaluation.", "slug": "south-west-jordan", "word_count": 257, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}