{"generated_at": "2026-11-07T09:26:20.440492+00:00", "key_stats": {"computed": "2026-11-07T08:50:16.616791+00:00", "constraint": null, "dcpi_score": 22.9, "excess": null, "facility_count": 11, "mw_reporting_count": 0, "name": "Silver Spring", "recent_deals": [], "slug": "silver-spring", "state": "MD", "top_operators": [{"count": 2, "name": "Lincoln Rackhouse"}, {"count": 1, "name": "Atlantech Online, Inc."}, {"count": 1, "name": "DataBridge Sites"}, {"count": 1, "name": "Agile Data Sites"}, {"count": 1, "name": "PROSPERITY DRIVE DATA CENTER, LLC"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Silver Spring", "narrative_md": "# Silver Spring Data Center Market Brief\n\nSilver Spring's tracked market comprises 11 facilities operated by a fragmented ownership base, with Lincoln Rackhouse holding two sites and five operators controlling single properties each. The market has recorded no recent deal activity in the tracked dataset. Atlantech Online, Inc., DataBridge Sites, PROSPERITY DRIVE DATA CENTER, LLC, and Agile Data Sites each operate one facility in the region.\n\nTogether, these scores suggest that operators and site developers should anticipate extended timelines for power procurement and higher complexity in securing new supply agreements.\n\nOperator fragmentation\u2014five operators across 11 sites\u2014reflects the typical structure of secondary markets in the Mid-Atlantic region. The absence of tracked deal flow in Silver Spring does not indicate market weakness but rather reflects the granular, non-disclosed nature of most real estate transactions at this scale.\n\nPower availability remains the primary variable shaping feasibility for new or expanded capacity in Silver Spring through 2027.", "slug": "silver-spring", "word_count": 244, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}