{"generated_at": "2026-11-07T09:26:53.608953+00:00", "key_stats": {"computed": "2026-11-07T08:50:09.093857+00:00", "constraint": null, "dcpi_score": 35.4, "excess": null, "facility_count": 2, "mw_reporting_count": 0, "name": "Sheridan", "recent_deals": [], "slug": "sheridan", "state": "WY", "top_operators": [{"count": 1, "name": "Advanced Communications Technology"}, {"count": 1, "name": "DC HOST INC"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Sheridan", "narrative_md": "# Sheridan Data Center Market Brief\n\nSheridan's tracked data center footprint consists of two facilities operated by Advanced Communications Technology and DC HOST INC, with no recent deal activity recorded. The market has generated limited transaction history, and local operators remain individually positioned without consolidation. Community engagement around data center development is documented, with Sheridan residents actively weighing regulatory and infrastructure implications of facility expansion in the region.\n\nOperators considering new builds or expansions should expect a measured, not unlimited, supply of new generation to support incremental load.\n\nSheridan's deal pipeline remains inactive with no tracked transactions. The two documented operators each control single facilities, indicating a fragmented market structure without dominant platform consolidation. This contrasts with some peer markets where single operators control significant portions of tracked sites, though those markets also show deal stagnation.\n\nRegulatory and community considerations appear material to Sheridan's development trajectory, based on documented local discourse around data center expansion and responsible development frameworks. Power availability and grid access remain technical prerequisites, but permitting and stakeholder alignment will likely shape the pace at which new capacity materializes in this market.", "slug": "sheridan", "word_count": 253, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}