{"generated_at": "2026-11-07T09:26:11.455702+00:00", "key_stats": {"computed": "2026-11-07T08:48:56.391841+00:00", "constraint": null, "dcpi_score": 21.7, "excess": null, "facility_count": 28, "mw_reporting_count": 1, "name": "Secaucus", "recent_deals": [], "slug": "secaucus", "state": "NJ", "top_operators": [{"count": 9, "name": "Equinix"}, {"count": 5, "name": "CoreSite"}, {"count": 2, "name": ""}, {"count": 2, "name": "Centersquare"}, {"count": 2, "name": "InterServer, Inc"}], "total_mw": 80.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Secaucus", "narrative_md": "Secaucus operates 28 tracked data center facilities dominated by Equinix (9 sites) and CoreSite (5 sites), with smaller presences from Centersquare and InterServer, Inc. Only one of the 28 tracked facilities publicly reports megawatt capacity, indicating either opacity around power specifications or fragmentation in how sites disclose operational metrics.\n\nThis assessment applies specifically to sourcing additional power supply\u2014the metric does not reflect market demand, facility quality, or operator viability, but rather the physical and financial friction of expanding electrical infrastructure in the area.\n\nDeal activity in Secaucus remains absent from recent tracking records, with no transactions logged. The operator landscape is concentrated: Equinix's nine-facility presence dwarfs second-place CoreSite at five facilities, creating asymmetry in the market's infrastructure ownership. Historical local reporting referenced two forthcoming data center projects that would have increased the town's total facility count, though these do not appear in current tracked deals, suggesting either extended development timelines or changes in project status.", "slug": "secaucus", "word_count": 266, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}