{"_gated":true,"as_of":"2026-09-22","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Announced":11,"Operational":25,"Planned":1,"Under Construction":2},"by_status_basis":"by_status and recent_facilities are read from city-grouped records of discovered_facilities (one row per record, not deduplicated across tables), so the status counts can total more than stats.facility_count. Quote stats.facility_count as the market's facility count.","market":{"cities":["Salt Lake City","West Valley","Sandy"],"id":"salt lake city","name":"Salt Lake City"},"market_pricing":{"asking_rate":null,"asking_rate_range":null,"available":true,"basis":"dchub_estimate","deal_size":null,"excludes":"Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number.","period":"2026-H2","rates_note":"Broker lease rates (CBRE/JLL): available on paid plans","rates_upgrade_url":"https://dchub.cloud/pricing","rates_withheld":true,"source":"DC Hub estimate. Anchored on JLL North America Data Center Report Midyear 2025 (1-5 MW, H1 2025): Salt Lake City (figure on paid plans); CBRE H1 2026 secondary-market ranges (figure on paid plans)","source_url":null,"stale":false,"unit":null,"vacancy_percent":null},"recent_facilities":[{"city":"Salt Lake City","discovered_at":"2026-09-22","id":13815587,"name":"Verizon Salt Lake City","power_mw":null,"provider":"Verizon Salt Lake","status":"Announced"},{"city":"Salt Lake City","discovered_at":"2026-08-29","id":12237704,"name":"Flexential Fair Park","power_mw":null,"provider":"Flexential Fair","status":"Announced"},{"city":"Salt Lake City","discovered_at":"2026-08-29","id":12237610,"name":"Databank Granite Point South Data Center Slc 3","power_mw":null,"provider":"Databank Granite Point South Data Center Slc","status":"Announced"},{"city":"Salt Lake City","discovered_at":"2026-08-29","id":12237702,"name":"Flexential Downtown Salt Lake City","power_mw":null,"provider":"Flexential Downtown Salt Lake","status":"Announced"},{"city":"Salt Lake City","discovered_at":"2026-08-27","id":12143880,"name":"Databank Granite Point North Data Center Slc2","power_mw":null,"provider":"Databank Granite Point North Data Center","status":"Announced"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-11-12T08:45:47.833794+00:00","band":"excess-power score at least 50 and grid-constraint score at most 70","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"partial","signal_tier_means":"input coverage: how many of the live grid feeds fed this market's score (full = every live-capable feed). Not an access level.","verdict":"CAUTION","verdict_means":"The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand."},"iso":{"as_of":"2026-11-12T08:45:47.833794+00:00","class":"REGION","code":"WECC","operator":"WECC"},"mw":{"as_of":"2026-09-22","coverage":"PARTIAL","coverage_pct":8.3,"note":"Sum over the rows that report capacity only; 7 of 84 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":7,"rows_total":84,"total_mw":454.0},"time_to_power":{"as_of":"2026-11-12T08:45:47.833794+00:00","band":"under_24_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":null,"basis":"UNMEASURED - no market-to-serving-utility mapping is published for this market. iso.operator is the grid operator, not the retail utility.","names":null}},"stats":{"avg_power_mw":null,"facility_count":84,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","mw_reporting_count":7,"provider_count":27,"total_power_mw":454.0,"unverified_included":true},"success":true,"top_providers":[{"facilities":11,"name":"Flexential","power_mw":null},{"facilities":5,"name":"Flexential Corp.","power_mw":null},{"facilities":4,"name":"DataBank","power_mw":null},{"facilities":3,"name":"Tract","power_mw":null},{"facilities":2,"name":"Novva Data Centers","power_mw":null}]}
