{"generated_at": "2026-11-07T09:23:21.781955+00:00", "key_stats": {"computed": "2026-11-07T08:50:18.104517+00:00", "constraint": null, "dcpi_score": 50.6, "excess": null, "facility_count": 4, "mw_reporting_count": 0, "name": "Saint Louis", "recent_deals": [], "slug": "saint-louis", "state": "MO", "top_operators": [{"count": 1, "name": "Arcadian Infracom"}, {"count": 1, "name": "Netrality Data Centers"}, {"count": 1, "name": "Unknown"}, {"count": 1, "name": "Washington University in St. Louis"}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Saint Louis", "narrative_md": "# Saint Louis Data Center Market Brief\n\nSaint Louis operates a nascent supply landscape with 4 tracked facilities across a fragmented operator base led by Arcadian Infracom, Netrality Data Centers, and Washington University in St. Louis, each running single sites. The market has recorded no recent transactions. Supply remains dispersed and underdeveloped relative to peer metros, with operator concentration extremely limited\u2014no single entity controls more than one facility in the tracked footprint.\n\nLocal regulatory activity underscores ongoing appetite for data center development despite these technical headwinds. That same project has drawn organized opposition and court filings, reflecting community-level friction that may slow permitting and operational sign-on. No recent tracked transactions have been recorded, leaving current operator expansion intentions opaque; the fragmented three-operator structure suggests no dominant player is consolidating or rapidly scaling footprint in the market.\n\nPower procurement will remain the critical bottleneck for new Saint Louis capacity additions in the near term.", "slug": "saint-louis", "word_count": 248, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}