{"_gated":true,"as_of":"2026-07-28 07:13:28.315809+00","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Operational":19,"unknown":1},"by_status_basis":"by_status and recent_facilities are read from city-grouped records of discovered_facilities (one row per record, not deduplicated across tables), so the status counts can total more than stats.facility_count. Quote stats.facility_count as the market's facility count.","market":{"cities":["Sacramento"],"id":"sacramento","name":"Sacramento"},"market_pricing":{"asking_rate":null,"asking_rate_range":null,"available":true,"basis":"dchub_estimate","deal_size":null,"excludes":"Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number.","period":"2026-H2","rates_note":"Broker lease rates (CBRE/JLL): available on paid plans","rates_upgrade_url":"https://dchub.cloud/pricing","rates_withheld":true,"source":"DC Hub estimate. Below Silicon Valley (CBRE North America Data Center Trends H1 2026 (250+ kW): (figure on paid plans)), above CBRE secondary markets (figure on paid plans) given CA industrial power ~20.6 c/kWh (EIA via DC Hub).","source_url":null,"stale":false,"unit":null,"vacancy_percent":null},"recent_facilities":[{"city":"SACRAMENTO","discovered_at":"2026-07-28 07:13:28.315809+00","id":10677365,"name":"NTT GLOBAL DATA CENTERS","power_mw":null,"provider":"NTT Global Data Centers","status":null},{"city":"Sacramento","discovered_at":"2026-03-31T01:09:31.355168","id":18741,"name":"QTS Sacramento","power_mw":null,"provider":"Quality Technology Services","status":"Operational"},{"city":"Sacramento","discovered_at":"2026-03-31T01:09:00.674033","id":18251,"name":"RagingWire CA1","power_mw":null,"provider":"NTT","status":"Operational"},{"city":"Sacramento","discovered_at":"2026-03-31T01:09:00.610565","id":18250,"name":"RagingWire CA2","power_mw":null,"provider":"NTT","status":"Operational"},{"city":"Sacramento","discovered_at":"2026-03-31T01:03:52.967397","id":14415,"name":"RagingWire CA3 - NTT","power_mw":null,"provider":"RagingWire Data Centers - NTT","status":"Operational"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-11-12T08:46:09.034029+00:00","band":"excess-power score at least 65 and grid-constraint score at most 50","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"full","signal_tier_means":"input coverage: how many of the live grid feeds fed this market's score (full = every live-capable feed). Not an access level.","verdict":"BUILD","verdict_means":"The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand."},"iso":{"as_of":"2026-11-12T08:46:09.034029+00:00","class":"REGION","code":"WECC","operator":"WECC"},"mw":{"as_of":"2026-07-28 07:13:28.315809+00","coverage":"PARTIAL","coverage_pct":11.7,"note":"Sum over the rows that report capacity only; 7 of 60 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":7,"rows_total":60,"total_mw":336.0},"time_to_power":{"as_of":"2026-11-12T08:46:09.034029+00:00","band":"under_24_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":"2026-09-30","basis":"CURATED - named from SMUD's territory-map page and the Sacramento County utility-providers page; DC Hub does not measure serving territory per site","detail":[{"kind":"public","name":"SMUD"}],"more_source_urls":["https://economic.saccounty.gov/content/econdev/us/en/utility-providers.html"],"names":["SMUD"],"note":"A market can span more than one utility; a specific site is served by whichever utility's territory it sits in. Names are in no order of importance.","source_url":"https://www.smud.org/Corporate/About-us/SMUDs-Territory-Map","split":false}},"stats":{"avg_power_mw":null,"facility_count":60,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","mw_reporting_count":7,"provider_count":10,"total_power_mw":336.0,"unverified_included":true},"success":true,"top_providers":[{"facilities":4,"name":"Prime","power_mw":null},{"facilities":4,"name":"NTT","power_mw":null},{"facilities":3,"name":"Frontier Sacramento","power_mw":null},{"facilities":3,"name":"RagingWire Data Centers","power_mw":null},{"facilities":2,"name":"QTS Realty","power_mw":null}]}
