{"_gated":true,"as_of":"2026-03-31T01:10:52.883035","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Operational":6,"Under Construction":2},"by_status_basis":"by_status and recent_facilities are read from city-grouped records of discovered_facilities (one row per record, not deduplicated across tables), so the status counts can total more than stats.facility_count. Quote stats.facility_count as the market's facility count.","market":{"cities":["Red Oak"],"id":"red-oak","name":"Red Oak"},"market_pricing":{"asking_rate":null,"asking_rate_range":null,"available":false,"basis":null,"reason":"DC Hub holds no lease-rate figure for this market yet. This is missing data, not a zero.","unit":"$/kW/mo","vacancy_percent":null},"recent_facilities":[{"city":"Red Oak","discovered_at":"2026-03-31T01:10:52.883035","id":20031,"name":"Compass Data Center","power_mw":null,"provider":"Unknown","status":"Operational"},{"city":"Red Oak","discovered_at":"2026-03-17","id":11524,"name":"DataBank Red Oak Mega Campus","power_mw":null,"provider":"DataBank","status":"Under Construction"},{"city":"Red Oak","discovered_at":"2026-03-17","id":7634,"name":"Compass Red Oak Campus (Dallas)","power_mw":null,"provider":"Compass Datacenters","status":"Under Construction"},{"city":"Red Oak","discovered_at":"2026-02-12T02:18:29.178267","id":10169,"name":"Compass Datacenters Red Oak TX","power_mw":null,"provider":"Compass","status":"Operational"},{"city":"Red Oak","discovered_at":"2026-01-17T09:40:20.571443","id":593,"name":"Compass Dallas 2","power_mw":null,"provider":"Compass","status":"Operational"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-11-12T08:47:02.807422+00:00","band":"excess-power score at least 50 and grid-constraint score at most 70","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"full","signal_tier_means":"input coverage: how many of the live grid feeds fed this market's score (full = every live-capable feed). Not an access level.","verdict":"CAUTION","verdict_means":"The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand."},"iso":{"as_of":"2026-11-12T08:47:02.807422+00:00","class":"RTO","code":"ERCOT","operator":"ERCOT"},"mw":{"as_of":"2026-03-31T01:10:52.883035","coverage":"PARTIAL","coverage_pct":42.9,"note":"Sum over the rows that report capacity only; 3 of 7 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":3,"rows_total":7,"total_mw":805.0},"time_to_power":{"as_of":"2026-11-12T08:47:02.807422+00:00","band":"24_to_48_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":null,"basis":"UNMEASURED - no market-to-serving-utility mapping is published for this market. iso.operator is the grid operator, not the retail utility.","names":null}},"stats":{"avg_power_mw":null,"facility_count":7,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","mw_reporting_count":3,"provider_count":5,"total_power_mw":805.0,"unverified_included":true},"success":true,"top_providers":[{"facilities":3,"name":"Compass","power_mw":null},{"facilities":1,"name":"DataBank","power_mw":null},{"facilities":1,"name":"Compass Datacenters","power_mw":null},{"facilities":1,"name":"ALAMO MISSION","power_mw":null}]}
