{"generated_at": "2026-11-07T09:21:19.358982+00:00", "key_stats": {"computed": "2026-11-07T08:50:20.181355+00:00", "constraint": null, "dcpi_score": 50.1, "excess": null, "facility_count": 7, "mw_reporting_count": 0, "name": "Puyallup", "recent_deals": [], "slug": "puyallup", "state": "WA", "top_operators": [{"count": 2, "name": ""}, {"count": 1, "name": "Centeris"}, {"count": 1, "name": "Centeris SH2 Build-to-Suit"}, {"count": 1, "name": "IsoFusion / Colocation Northwest"}, {"count": 1, "name": "ScaleMatrix Holdings, Inc."}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Puyallup", "narrative_md": "# Puyallup Data Center Market Brief\n\nPuyallup's tracked colocation ecosystem comprises seven facilities operated by a small group of regional and specialized providers, with Centeris holding two build-to-suit offerings alongside single sites managed by IsoFusion/Colocation Northwest and ScaleMatrix Holdings. No recent transactions have been recorded in this market, and operator presence remains concentrated among established colocation vendors rather than hyperscale entrants. The market maintains a nascent deal pipeline with no announced acquisitions or capacity sales currently tracked.\n\nOperator density in Puyallup centers on regional specialists rather than national platforms. Centeris operates both a core facility and a build-to-suit vehicle, positioning the company as the largest tracked presence in the market. IsoFusion and ScaleMatrix each hold single facilities, reflecting a fragmented supply base. The absence of recent tracked deals suggests limited M&A or secondary capacity transitions over the current measurement window, consistent with the region's smaller footprint relative to Pacific Northwest peers like The Dalles or emerging capacity zones.\n\nPower procurement strategy in Puyallup should account for lead times tied to grid study requirements and utility coordination; new entrants should model for 18\u201336 month timelines to secure dedicated feeds or substation access, particularly if loads exceed 5\u201310 MW incremental demand.", "slug": "puyallup", "word_count": 285, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}