{"generated_at": "2026-11-07T09:21:08.742453+00:00", "key_stats": {"computed": "2026-11-07T08:49:22.412315+00:00", "constraint": null, "dcpi_score": 33.9, "excess": null, "facility_count": 16, "mw_reporting_count": 0, "name": "Providence", "recent_deals": [], "slug": "providence", "state": "RI", "top_operators": [{"count": 3, "name": "Provdotnet LLC"}, {"count": 2, "name": "Crown Castle Inc."}, {"count": 2, "name": "Verizon Providence"}, {"count": 1, "name": "Prov Net Providence"}, {"count": 1, "name": "Meganet Communications Providence"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Providence", "narrative_md": "# Providence Data Center Market Brief\n\nThe market hosts 16 tracked facilities operated by a fragmented vendor base anchored by Provdotnet LLC (3 sites), Crown Castle Inc. (2), and Verizon Providence (2). No tracked facility has reported megawatt capacity to the market, making total footprint opaque.\n\nThe DCPI verdict of AVOID signals material friction in acquiring new power supply. A score this low reflects either tight distribution infrastructure, limited utility appetite for new load, or both\u2014conditions that compound over time as incumbent facilities lock in positions. For siting and build teams, this means utility engagement must begin early and assume protracted negotiation cycles.\n\nDeal flow in Providence remains absent from recent tracking, and the operator roster reflects a mix of regional and national carriers rather than hyperscale or wholesale colocation players. Provdotnet LLC's three-site footprint is the largest single operator presence; the rest are distributed across two facilities each or held singly. The lack of recent deal records\u2014paired with no operator announcements in tracked news\u2014indicates either market maturity with stable holdings or limited capital activity focused on new supply.\n\nPower availability will remain the primary gating factor for new projects in Providence through 2026 and beyond.", "slug": "providence", "word_count": 263, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}