{"generated_at": "2026-11-07T09:18:07.600282+00:00", "key_stats": {"computed": "2026-11-07T08:49:10.132143+00:00", "constraint": null, "dcpi_score": 18.3, "excess": null, "facility_count": 54, "mw_reporting_count": 2, "name": "Pittsburgh", "recent_deals": [], "slug": "pittsburgh", "state": "PA", "top_operators": [{"count": 5, "name": "DataBank"}, {"count": 4, "name": "Expedient"}, {"count": 2, "name": "DQE Communications LLC"}, {"count": 2, "name": "EdgeConneX"}, {"count": 1, "name": "Bare Metal Pittsburgh Bare Metal Pittsburgh"}], "total_mw": 12.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Pittsburgh", "narrative_md": "Pittsburgh's tracked data center footprint spans 54 facilities totaling 12 MW across operational, under-construction, and planned sites. DataBank operates the largest portfolio with five facilities, followed by Expedient with four; the remaining capacity is distributed among DQE Communications LLC, EdgeConneX, and Bare Metal Pittsburgh. No recent deals have been tracked in the market, leaving the operator landscape relatively static over the current observation window.\n\nThe DCPI verdict of AVOID reflects a structural power supply challenge.\n\nThe operator base remains concentrated, with DataBank and Expedient controlling nine of the 54 tracked sites. The absence of recent deal flow\u2014no acquisitions, dispositions, or expansions tracked\u2014indicates either market saturation within the existing footprint or reduced new-build momentum. Pennsylvania-level activity, including Alpha Compute's land and gas-rights acquisition for a data center campus, underscores regional interest in the broader state; however, no such transactions have materialized in Pittsburgh proper. Proposed projects, including Switch's plans for up to 270 MW of generator capacity on a former racetrack site and Elizabeth Township's disclosed power plant and data center plans, remain in pre-development or planning phases and are not yet reflected in the tracked operational or under-construction counts.", "slug": "pittsburgh", "word_count": 281, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}