{"generated_at": "2026-11-07T09:16:25.131621+00:00", "key_stats": {"computed": "2026-11-07T08:49:45.789872+00:00", "constraint": null, "dcpi_score": 31.0, "excess": null, "facility_count": 26, "mw_reporting_count": 1, "name": "Orlando", "recent_deals": [], "slug": "orlando", "state": "FL", "top_operators": [{"count": 2, "name": "HostDime"}, {"count": 2, "name": "CoreSite"}, {"count": 1, "name": "CORESITE REAL ESTATE OR1 LLC"}, {"count": 1, "name": "Colo Solutions Orlando"}, {"count": 1, "name": "Centurylink Orlando"}], "total_mw": 6.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Orlando", "narrative_md": "# Orlando Data Center Market Brief\n\nOrlando's tracked data center footprint comprises 26 facilities operated by a fragmented vendor base, with HostDime and CoreSite each running two sites and Colo Solutions Orlando, Centurylink Orlando, and CORESITE REAL ESTATE OR1 LLC each operating single facilities. Only one tracked site in the market reports megawatt figures publicly, limiting visibility into total installed capacity. The operator roster shows no dominant player, and geographic concentration data suggests modest clustering rather than a dense hub formation.\n\nThe DCPI verdict of AVOID reflects a compressive environment for new power procurement. Power procurement timelines and utility coordination costs should be modeled as material project variables.\n\nThe operator cohort remains stable and locally rooted, with no evidence of consolidation or portfolio reshuffling. Regional context\u2014including recent opposition to data center siting in adjacent Orange County\u2014may further influence deal appetite and permitting timelines for expansion projects in the broader Orlando metro area.", "slug": "orlando", "word_count": 290, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}