{"_gated":true,"as_of":"2026-07-28 07:13:29.929486+00","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Operational":9,"duplicate":1,"unknown":1},"by_status_basis":"by_status and recent_facilities are read from city-grouped records of discovered_facilities (one row per record, not deduplicated across tables), so the status counts can total more than stats.facility_count. Quote stats.facility_count as the market's facility count.","market":{"cities":["Northlake"],"id":"northlake","name":"Northlake"},"market_pricing":{"asking_rate":null,"asking_rate_range":null,"available":false,"basis":null,"reason":"DC Hub holds no lease-rate figure for this market yet. This is missing data, not a zero.","unit":"$/kW/mo","vacancy_percent":null},"recent_facilities":[{"city":"NORTHLAKE","discovered_at":"2026-07-28 07:13:29.929486+00","id":10677431,"name":"ALIGNED ENERGY","power_mw":null,"provider":"Aligned Data Centers","status":null},{"city":"NORTHLAKE","discovered_at":"2026-07-28 07:13:28.068909+00","id":10677355,"name":"MICROSOFT CORP-CHICAGO DATA CENTER","power_mw":null,"provider":"Microsoft","status":"duplicate"},{"city":"Northlake","discovered_at":"2026-03-31T01:11:33.154367","id":20667,"name":"Aligned Data Center - Chicago ORD-02","power_mw":null,"provider":"Aligned","status":"Operational"},{"city":"Northlake","discovered_at":"2026-03-31T01:10:18.874480","id":19496,"name":"Microsoft - Azure Datacenter","power_mw":null,"provider":"Microsoft","status":"Operational"},{"city":"Northlake","discovered_at":"2026-02-07T01:24:18.017919","id":6395,"name":"Aligned Chicago (ORD-02)","power_mw":null,"provider":"Aligned Data Centers","status":"Operational"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-11-12T08:46:57.515436+00:00","band":"did not clear a BUILD or CAUTION band (fallback; includes a market with a missing input)","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"full","signal_tier_means":"input coverage: how many of the live grid feeds fed this market's score (full = every live-capable feed). Not an access level.","verdict":"AVOID","verdict_means":"The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand."},"iso":{"as_of":"2026-11-12T08:46:57.515436+00:00","class":"RTO","code":"PJM","operator":"PJM Interconnection"},"mw":{"as_of":"2026-07-28 07:13:29.929486+00","coverage":"PARTIAL","coverage_pct":8.3,"note":"Sum over the rows that report capacity only; 1 of 12 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":1,"rows_total":12,"total_mw":28.0},"time_to_power":{"as_of":"2026-11-12T08:46:57.515436+00:00","band":"over_48_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":null,"basis":"UNMEASURED - no market-to-serving-utility mapping is published for this market. iso.operator is the grid operator, not the retail utility.","names":null}},"stats":{"avg_power_mw":null,"facility_count":12,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","mw_reporting_count":1,"provider_count":5,"total_power_mw":28.0,"unverified_included":true},"success":true,"top_providers":[{"facilities":3,"name":"Aligned","power_mw":null},{"facilities":3,"name":"Aligned Data Centers","power_mw":null},{"facilities":2,"name":"Microsoft","power_mw":null},{"facilities":1,"name":"MICROSOFT CORP-CHICAGO DATA CENTER","power_mw":null},{"facilities":1,"name":"Ascent, LLC","power_mw":null}]}
