{"_gated":true,"as_of":"2026-08-25","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Announced":3,"Operational":31},"by_status_basis":"by_status and recent_facilities are read from city-grouped records of discovered_facilities (one row per record, not deduplicated across tables), so the status counts can total more than stats.facility_count. Quote stats.facility_count as the market's facility count.","market":{"cities":["Nashville"],"id":"nashville","name":"Nashville"},"market_pricing":{"asking_rate":null,"asking_rate_range":null,"available":true,"basis":"dchub_estimate","deal_size":null,"excludes":"Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number.","period":"2026-H2","rates_note":"Broker lease rates (CBRE/JLL): available on paid plans","rates_upgrade_url":"https://dchub.cloud/pricing","rates_withheld":true,"source":"DC Hub estimate. Nearest covered market Atlanta (CBRE North America Data Center Trends H1 2026 (250+ kW): (figure on paid plans)) less the secondary-market discount seen in CBRE H1 2026 (figure on paid plans); TN industrial power ~6.8 c/kWh (EIA via DC Hub).","source_url":null,"stale":false,"unit":null,"vacancy_percent":null},"recent_facilities":[{"city":"Nashville","discovered_at":"2026-08-25","id":12022678,"name":"365 Data Centers Nashville Na1","power_mw":null,"provider":"365 Data Centers Nashville","status":"Announced"},{"city":"Nashville","discovered_at":"2026-08-02","id":11091039,"name":"Centurylink Nashville 3","power_mw":null,"provider":"Centurylink Nashville","status":"Announced"},{"city":"Nashville","discovered_at":"2026-08-02","id":11091040,"name":"Centurylink Nashville 1","power_mw":null,"provider":"Centurylink Nashville","status":"Announced"},{"city":"Nashville","discovered_at":"2026-05-22T19:10:16.653134","id":1563843,"name":"Tennessee South Data Center","power_mw":null,"provider":"State of Tennessee","status":"Operational"},{"city":"Nashville","discovered_at":"2026-03-31T01:12:18.489563","id":21348,"name":"Verizon Wireless","power_mw":null,"provider":"Unknown","status":"Operational"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-11-12T08:45:42.663103+00:00","band":"did not clear a BUILD or CAUTION band (fallback; includes a market with a missing input)","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"partial","signal_tier_means":"input coverage: how many of the live grid feeds fed this market's score (full = every live-capable feed). Not an access level.","verdict":"AVOID","verdict_means":"The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand."},"iso":{"as_of":"2026-11-12T08:45:42.663103+00:00","class":"BA","code":"TVA","operator":"Tennessee Valley Authority"},"mw":{"as_of":"2026-08-25","coverage":"PARTIAL","coverage_pct":3.3,"note":"Sum over the rows that report capacity only; 2 of 60 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":2,"rows_total":60,"total_mw":112.0},"time_to_power":{"as_of":"2026-11-12T08:45:42.663103+00:00","band":"under_24_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":"2026-09-30","basis":"CURATED - named from Nashville Electric Service's about page; DC Hub does not measure serving territory per site","detail":[{"kind":"public","name":"Nashville Electric Service"}],"more_source_urls":[],"names":["Nashville Electric Service"],"note":"A market can span more than one utility; a specific site is served by whichever utility's territory it sits in. Names are in no order of importance.","source_url":"https://www.nespower.com/about-nes/","split":false}},"stats":{"avg_power_mw":null,"facility_count":60,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","mw_reporting_count":2,"provider_count":19,"total_power_mw":112.0,"unverified_included":true},"success":true,"top_providers":[{"facilities":8,"name":"Flexential","power_mw":null},{"facilities":3,"name":"365 Data Centers","power_mw":null},{"facilities":2,"name":"Meta","power_mw":null},{"facilities":2,"name":"Centurylink Nashville","power_mw":null},{"facilities":2,"name":"EdgeConneX","power_mw":null}]}
