{"generated_at": "2026-11-07T09:10:06.424568+00:00", "key_stats": {"computed": "2026-11-07T08:48:48.349816+00:00", "constraint": null, "dcpi_score": 48.1, "excess": null, "facility_count": 38, "mw_reporting_count": 0, "name": "McCarran", "recent_deals": [], "slug": "mccarran", "state": "NV", "top_operators": [{"count": 16, "name": "Unknown"}, {"count": 14, "name": ""}, {"count": 6, "name": "Switch"}, {"count": 1, "name": "EdgeCore Digital Infrastructure"}, {"count": 1, "name": "Switch, Ltd."}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "McCarran", "narrative_md": "# McCarran Data Center Market Brief\n\nMcCarran's tracked portfolio comprises 38 facilities across six operators, with Switch holding the largest presence at six sites. No recent deals have been tracked in this market segment.\n\nThe DCPI verdict of CAUTION reflects a mixed power-supply picture. This score suggests new power procurement is viable but not effortless; operators can access additional capacity, but without the surplus margins that lower friction. Together, these metrics indicate that new capacity additions face moderate\u2014not acute\u2014headwinds on the supply side, though power costs and lead times remain material planning variables.\n\nSwitch dominates operator count with six tracked facilities; EdgeCore Digital Infrastructure and Switch, Ltd. each operate one site. This concentration reflects Switch's long-standing regional footprint, though the fragmentation across legal entities suggests varied ownership or asset structures. Neither of these deals is attributed to McCarran. No acquisition or infrastructure M&A activity has been logged for this market recently.", "slug": "mccarran", "word_count": 257, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}