{"generated_at": "2026-11-07T09:54:52.634890+00:00", "key_stats": {"computed": "2026-11-07T08:48:10.646858+00:00", "constraint": null, "dcpi_score": 20.7, "excess": null, "facility_count": 4, "mw_reporting_count": 0, "name": "Luckey", "recent_deals": [], "slug": "luckey", "state": "OH", "top_operators": [{"count": 1, "name": ""}, {"count": 1, "name": "Amplex Electric, Inc."}, {"count": 1, "name": "Meta"}, {"count": 1, "name": "Unknown"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Luckey", "narrative_md": "# Luckey Data Center Market Brief\n\nLuckey's tracked footprint comprises four facilities split between two operators: Amplex Electric, Inc. and Meta each operate one tracked site, with two additional facilities present but operator details not recorded. The market shows fragmented control with no centralized capacity reporting\u2014individual site MW figures are not publicly available through current tracking channels.\n\nTogether, these readings suggest that securing additional power capacity for new or expanded operations will face both availability and infrastructure headwinds.\n\nNo recent deals have been tracked in Luckey, leaving current operator intentions opaque. Meta's presence signals hyperscaler interest in the broader region, though activity specific to Luckey remains unrecorded. Amplex Electric's single-site footprint suggests a smaller, localized operator posture. Without recent transaction data, operator expansion plans, power commitments, or interconnection moves cannot be inferred.\n\nGiven Ohio's emerging profile as a data center investment target, Luckey's position within the state's fragmented 505 MW installed base warrants monitoring for longer-term supply evolution.", "slug": "luckey", "word_count": 219, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}