{"_gated":true,"as_of":"2026-09-23","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Announced":11,"Operational":64},"by_status_basis":"by_status and recent_facilities are read from city-grouped records of discovered_facilities (one row per record, not deduplicated across tables), so the status counts can total more than stats.facility_count. Quote stats.facility_count as the market's facility count.","market":{"cities":["Johannesburg"],"id":"johannesburg-za","name":"Johannesburg"},"market_pricing":{"asking_rate":null,"asking_rate_range":null,"available":false,"basis":null,"reason":"DC Hub holds no lease-rate figure for this market yet. This is missing data, not a zero.","unit":"$/kW/mo","vacancy_percent":null},"recent_facilities":[{"city":"Johannesburg","discovered_at":"2026-09-23","id":13865964,"name":"Xneelo Xneelo Data Centre Park","power_mw":null,"provider":"Xneelo Xneelo Data Centre","status":"Announced"},{"city":"Johannesburg","discovered_at":"2026-09-08","id":12902082,"name":"Ntt Global Data Centers Emea Johannesburg 1","power_mw":null,"provider":"Ntt Global Data Centers Emea Johannesburg","status":"Announced"},{"city":"Johannesburg","discovered_at":"2026-09-08","id":12902083,"name":"Ntt Global Data Centers Emea Johannesburg 1","power_mw":null,"provider":"Ntt Global Data Centers Emea Johannesburg","status":"Announced"},{"city":"Johannesburg","discovered_at":"2026-09-06","id":12748248,"name":"Africa Data Centres Africa Data Centres Samrand Jhb2","power_mw":null,"provider":"Africa Data Centres Africa Data Centres Samrand","status":"Announced"},{"city":"Johannesburg","discovered_at":"2026-09-03","id":12582139,"name":"Africa Data Centres Africa Data Centres Johannesburg Jhb1","power_mw":null,"provider":"Africa Data Centres Africa Data Centres Johannesburg","status":"Announced"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-11-12T08:49:11.587806+00:00","band":"did not clear a BUILD or CAUTION band (fallback; includes a market with a missing input)","data_basis":"modeled_estimate","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"low","signal_tier_means":"input coverage: how many of the live grid feeds fed this market's score (full = every live-capable feed). Not an access level.","verdict":"AVOID","verdict_means":"The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand."},"iso":{"as_of":"2026-11-12T08:49:11.587806+00:00","class":null,"code":"ESKOM","operator":"Eskom (South Africa)"},"mw":{"as_of":"2026-09-23","coverage":"PARTIAL","coverage_pct":3.4,"note":"Sum over the rows that report capacity only; 4 of 116 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":4,"rows_total":116,"total_mw":103.0},"time_to_power":{"as_of":"2026-11-12T08:49:11.587806+00:00","band":"24_to_48_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":null,"basis":"UNMEASURED - no market-to-serving-utility mapping is published for this market. iso.operator is the grid operator, not the retail utility.","names":null}},"stats":{"avg_power_mw":null,"facility_count":116,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","mw_reporting_count":4,"provider_count":34,"total_power_mw":103.0,"unverified_included":true},"success":true,"top_providers":[{"facilities":7,"name":"Teraco","power_mw":null},{"facilities":4,"name":"Vantage Data Centers","power_mw":null},{"facilities":3,"name":"NTT","power_mw":null},{"facilities":3,"name":"NTT DATA, Middle East and Africa (MEA)","power_mw":null},{"facilities":2,"name":"Africa Data Centres","power_mw":null}]}
