{"_gated":true,"as_of":"2026-09-10","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Announced":19,"Operational":50,"Under Construction":2},"by_status_basis":"by_status and recent_facilities are read from city-grouped records of discovered_facilities (one row per record, not deduplicated across tables), so the status counts can total more than stats.facility_count. Quote stats.facility_count as the market's facility count.","market":{"cities":["Houston","The Woodlands","Sugar Land","Katy"],"id":"houston","name":"Houston"},"market_pricing":{"asking_rate":null,"asking_rate_range":null,"available":true,"basis":"broker_report","deal_size":null,"excludes":"Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number.","period":"H1 2026","rates_note":"Broker lease rates (CBRE/JLL): available on paid plans","rates_upgrade_url":"https://dchub.cloud/pricing","rates_withheld":true,"source":"CBRE North America Data Center Trends H1 2026 (250+ kW): Houston (figure on paid plans)","source_url":"https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026","stale":false,"unit":null,"vacancy_percent":null},"recent_facilities":[{"city":"Houston","discovered_at":"2026-09-10","id":13118592,"name":"Digital Realty Digital Houston Campus Iah11","power_mw":null,"provider":"Digital Realty Digital Houston Campus","status":"Announced"},{"city":"Houston","discovered_at":"2026-09-10","id":13118593,"name":"Digital Realty Digital Houston Campus Iah14","power_mw":null,"provider":"Digital Realty Digital Houston Campus","status":"Announced"},{"city":"Houston","discovered_at":"2026-09-08","id":12901458,"name":"Enzu Iah1","power_mw":null,"provider":"Enzu","status":"Announced"},{"city":"Houston","discovered_at":"2026-09-08","id":12901455,"name":"Enzu Iah1","power_mw":null,"provider":"Enzu","status":"Announced"},{"city":"Houston","discovered_at":"2026-09-08","id":12901456,"name":"Enzu Iah1","power_mw":null,"provider":"Enzu","status":"Announced"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-11-12T08:45:29.601757+00:00","band":"excess-power score at least 50 and grid-constraint score at most 70","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"full","signal_tier_means":"input coverage: how many of the live grid feeds fed this market's score (full = every live-capable feed). Not an access level.","verdict":"CAUTION","verdict_means":"The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand."},"iso":{"as_of":"2026-11-12T08:45:29.601757+00:00","class":"RTO","code":"ERCOT","operator":"ERCOT"},"mw":{"as_of":"2026-09-10","coverage":"PARTIAL","coverage_pct":14.9,"note":"Sum over the rows that report capacity only; 14 of 94 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":14,"rows_total":94,"total_mw":1075.0},"time_to_power":{"as_of":"2026-11-12T08:45:29.601757+00:00","band":"24_to_48_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":"2026-09-30","basis":"CURATED - named from CenterPoint Energy's about page (Greater Houston) and The Woodlands Township utility page (CenterPoint and Entergy); DC Hub does not measure serving territory per site","detail":[{"kind":"IOU","name":"CenterPoint Energy Houston Electric"},{"kind":"IOU","name":"Entergy Texas"}],"more_source_urls":["https://www.thewoodlandstownship-tx.gov/Community/My-area/Creekside-Park/CenterPoint-Energy"],"names":["CenterPoint Energy Houston Electric","Entergy Texas"],"note":"A market can span more than one utility; a specific site is served by whichever utility's territory it sits in. Names are in no order of importance.","source_url":"https://www.centerpointenergy.com/en-us/about-us","split":true}},"stats":{"avg_power_mw":null,"facility_count":94,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","mw_reporting_count":14,"provider_count":41,"total_power_mw":1075.0,"unverified_included":true},"success":true,"top_providers":[{"facilities":5,"name":"CyrusOne","power_mw":null},{"facilities":5,"name":"DataBank","power_mw":null},{"facilities":4,"name":"ServerFarm","power_mw":null},{"facilities":3,"name":"Digital Realty Digital Houston Campus","power_mw":null},{"facilities":2,"name":"Skybox Datacenters","power_mw":null}]}
