{"generated_at": "2026-11-09T09:02:09.089860+00:00", "key_stats": {"computed": "2026-11-09T08:33:10.479695+00:00", "constraint": null, "dcpi_score": 43.2, "excess": null, "facility_count": 4, "mw_reporting_count": 0, "name": "Hammond", "recent_deals": [], "slug": "hammond", "state": "IN", "top_operators": [{"count": 2, "name": "Digital Crossroad"}, {"count": 1, "name": "DX HAMMOND JV LLC"}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Hammond", "narrative_md": "# Hammond Data Center Power & Supply Brief\n\nHammond's tracked market comprises 4 facilities operated primarily by Digital Crossroad (2 sites) and DX HAMMOND JV LLC (1 site). The market shows fragmentation across a small operator base with limited transparency\u2014only one tracked site currently reports megawatt capacity to the market. This concentration among two operators and the absence of publicly reported aggregate capacity figures suggest a nascent or intentionally opaque market structure typical of secondary Indiana corridors.\n\nTogether, these scores suggest that Hammond can accommodate incremental power draw, but operators pursuing greenfield or major expansion projects should expect non-trivial engineering and infrastructure coordination with local utilities. Power availability is present but tight.\n\nNo recent deals have been tracked in Hammond, a notable void given broader industry momentum. Kansas City and Indianapolis markets, despite their own deal sparseness, show operator interest in regional Indiana and Midwest expansion through land acquisition and greenfield signaling. Hammond's deal silence does not necessarily indicate lack of operator interest, but rather that any transactions\u2014if occurring\u2014remain untracked or are structured outside conventional capital event reporting.", "slug": "hammond", "word_count": 268, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}