{"_gated":true,"as_of":"2026-11-09 04:29:53.043955+00","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Announced":22,"Operational":84,"Under Construction":1,"unknown":7},"by_status_basis":"by_status and recent_facilities are read from city-grouped records of discovered_facilities (one row per record, not deduplicated across tables), so the status counts can total more than stats.facility_count. Quote stats.facility_count as the market's facility count.","market":{"cities":["Denver","Aurora","Centennial","Boulder"],"id":"denver","name":"Denver"},"market_pricing":{"asking_rate":null,"asking_rate_range":null,"available":true,"basis":"broker_report","deal_size":null,"excludes":"Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number.","period":"H1 2026","rates_note":"Broker lease rates (CBRE/JLL): available on paid plans","rates_upgrade_url":"https://dchub.cloud/pricing","rates_withheld":true,"source":"CBRE North America Data Center Trends H1 2026 (250+ kW): Denver (figure on paid plans)","source_url":"https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026","stale":false,"unit":null,"vacancy_percent":null},"recent_facilities":[{"city":"Aurora","discovered_at":"2026-11-09 04:29:53.043955+00","id":16379905,"name":"CyrusOne CHI9","power_mw":null,"provider":"CyrusOne","status":null},{"city":"Centennial","discovered_at":"2026-10-24 04:35:00.736214+00","id":15625195,"name":"DataBank - DEN2","power_mw":null,"provider":"DataBank","status":null},{"city":"Centennial","discovered_at":"2026-10-24 04:35:00.536756+00","id":15625194,"name":"DataBank - DEN5","power_mw":null,"provider":"DataBank","status":null},{"city":"AURORA","discovered_at":"2026-10-19 23:35:02.639986+00","id":15423452,"name":"AMAZON DATA SERVICES - DEN-22","power_mw":null,"provider":"Amazon Web Services","status":"Operational"},{"city":"Centennial","discovered_at":"2026-09-19T07:03:45.883534","id":13624837,"name":"Flexential - DEN5","power_mw":null,"provider":"Flexential","status":null}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-11-12T08:45:33.334122+00:00","band":"excess-power score at least 50 and grid-constraint score at most 70","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"full","signal_tier_means":"input coverage: how many of the live grid feeds fed this market's score (full = every live-capable feed). Not an access level.","verdict":"CAUTION","verdict_means":"The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand."},"iso":{"as_of":"2026-11-12T08:45:33.334122+00:00","class":"REGION","code":"WECC","operator":"WECC"},"mw":{"as_of":"2026-11-09 04:29:53.043955+00","coverage":"PARTIAL","coverage_pct":12.0,"note":"Sum over the rows that report capacity only; 17 of 142 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":17,"rows_total":142,"total_mw":471.0},"time_to_power":{"as_of":"2026-11-12T08:45:33.334122+00:00","band":"under_24_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":"2026-09-30","basis":"CURATED - named from the Metro Denver Economic Development Corporation utilities page; DC Hub does not measure serving territory per site","detail":[{"kind":"IOU","name":"Xcel Energy (Public Service Company of Colorado)"},{"kind":"co-op","name":"United Power"},{"kind":"co-op","name":"CORE Electric Cooperative"}],"more_source_urls":[],"names":["Xcel Energy (Public Service Company of Colorado)","United Power","CORE Electric Cooperative"],"note":"A market can span more than one utility; a specific site is served by whichever utility's territory it sits in. Names are in no order of importance.","source_url":"https://www.metrodenver.org/do-business/transportation-and-infrastructure/telecom-utilities","split":true}},"stats":{"avg_power_mw":null,"facility_count":142,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","mw_reporting_count":17,"provider_count":48,"total_power_mw":471.0,"unverified_included":true},"success":true,"top_providers":[{"facilities":12,"name":"Flexential","power_mw":null},{"facilities":6,"name":"DataBank","power_mw":null},{"facilities":5,"name":"CoreSite","power_mw":null},{"facilities":3,"name":"Equinix","power_mw":null},{"facilities":2,"name":"EdgeConneX","power_mw":null}]}
