{"generated_at": "2026-11-08T05:23:54.799710+00:00", "key_stats": {"computed": "2026-11-08T05:15:08.661758+00:00", "constraint": null, "dcpi_score": 53.5, "excess": null, "facility_count": 21, "mw_reporting_count": 1, "name": "Colorado Springs", "recent_deals": [], "slug": "colorado-springs", "state": "CO", "top_operators": [{"count": 2, "name": "Data102"}, {"count": 1, "name": "Colohouse Colorado Springs"}, {"count": 1, "name": "Centurylink Colorado Springs"}, {"count": 1, "name": "Hewlett Packard Colorado Springs"}, {"count": 1, "name": ""}], "total_mw": 5.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Colorado Springs", "narrative_md": "# Colorado Springs Data Center Power & Supply Brief\n\nColorado Springs hosts 21 tracked facilities across a fragmented operator base, with Data102 operating the largest presence at two sites and four other operators each maintaining single facilities. Only one tracked site publicly reports megawatt consumption, making market-wide capacity assessment impossible.\n\nThe CAUTION verdict reflects tension between available power and the infrastructure required to deliver it. New construction or major expansion at existing sites will require site-specific feasibility work; blanket assumptions about power availability do not apply. The gap between generation surplus and delivery capability is the defining supply-side dynamic here.\n\nDeal flow has stalled entirely, with no recent transactions tracked. Operator fragmentation\u2014dominated by Data102 but distributed across five separate entities\u2014has produced no consolidation activity, M&A, or secondary market movement. This dormancy persists despite citywide attention to data center growth; Colorado Springs municipal authorities have adopted Community-First Data Center Standards and fielded community appeals and regulatory review around proposed AI-class facilities, signaling that policy and land-use friction are active rather than settled.", "slug": "colorado-springs", "word_count": 260, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}