{"generated_at": "2026-11-07T09:50:42.975622+00:00", "key_stats": {"computed": "2026-11-07T08:49:24.014297+00:00", "constraint": null, "dcpi_score": 16.2, "excess": null, "facility_count": 56, "mw_reporting_count": 2, "name": "Chennai", "recent_deals": [{"buyer": "Vyoma.AI", "date": null, "id": "ext_6131bf9e0517da36bba7", "mw": null, "seller": null, "source_url": "https://www.datacenterdynamics.com/en/news/lts-data-center-unit-to-host-nvidia-hardware-for-together-ai/", "type": "lease", "value": null, "value_unit": "usd_millions"}], "slug": "chennai", "state": "IN", "top_operators": [{"count": 4, "name": "Atria Convergence Technologies Ltd"}, {"count": 3, "name": "STT GDC"}, {"count": 3, "name": "Digital Realty"}, {"count": 2, "name": ""}, {"count": 2, "name": "AdaniConneX"}], "total_mw": 73.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Chennai", "narrative_md": "# Chennai Data Center Market Brief\n\nChennai's tracked data center portfolio spans 56 facilities totaling 73 MW across operational, under-construction, and planned sites. Atria Convergence Technologies leads with four facilities, followed by STT GDC and Digital Realty at three each, and AdaniConneX with two. The market's four-operator concentration reflects a maturing but still fragmented supply base relative to India's larger metros.\n\nThe DCPI verdict of AVOID reflects structural power supply challenges that will constrain new capacity additions. Together, these metrics indicate that sourcing reliable, dedicated power for incremental MW capacity will require either long-lead infrastructure buildouts or creative offtake arrangements outside conventional utility channels.\n\nRecent announced projects underscore active pipeline momentum despite these supply headwinds. CapitaLand announced a 53 MW facility before end-of-year, representing a 73% expansion of tracked supply from a single player. L&T broke ground on a second 52 MW Chennai facility to support its Vyoma cloud unit, signaling captive capacity deployment by major conglomerates. A Vyoma.AI lease deal was recorded but terms remain unspecified.", "slug": "chennai", "word_count": 301, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}