{"generated_at": "2026-11-07T09:46:10.203013+00:00", "key_stats": {"computed": "2026-11-07T08:49:33.592857+00:00", "constraint": null, "dcpi_score": 24.0, "excess": null, "facility_count": 56, "mw_reporting_count": 0, "name": "Brisbane", "recent_deals": [], "slug": "brisbane", "state": "QL", "top_operators": [{"count": 4, "name": "Pipe Networks Pipe DC"}, {"count": 3, "name": "Vocus Group"}, {"count": 2, "name": "Equinix"}, {"count": 1, "name": "Aapt Aapt Fortitude Valley"}, {"count": 1, "name": "Brennan It Brisbane"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Brisbane", "narrative_md": "# Brisbane Data Center Market Brief\n\nBrisbane's data center footprint comprises 56 tracked facilities across a fragmented operator base, with Pipe Networks operating four sites and Vocus Group three. No recent deals have been tracked in the market.\n\nThis combination does not preclude new projects\u2014a 10-story data center facility is in planning stages outside Brisbane with co-location near battery energy storage and a substation\u2014but it does signal that new power will not be readily available at current grid terms.\n\nThe operator landscape is concentrated among regional and national carriers. Pipe Networks holds four facilities, Vocus Group three, and Equinix two, with smaller operators including Aapt and Brennan IT each holding single sites. This does not indicate market weakness or operator retrenchment; it reflects the current data capture window and the regional nature of Brisbane's operator base, which differs markedly from consolidation patterns visible in larger Asia-Pacific hubs currently attracting consortium-scale investment.", "slug": "brisbane", "word_count": 274, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}