{"generated_at": "2026-11-07T09:43:39.707002+00:00", "key_stats": {"computed": "2026-11-07T08:49:31.009438+00:00", "constraint": null, "dcpi_score": 31.5, "excess": null, "facility_count": 62, "mw_reporting_count": 0, "name": "Boston", "recent_deals": [], "slug": "boston", "state": "MA", "top_operators": [{"count": 3, "name": "DataBank"}, {"count": 2, "name": "Enzu"}, {"count": 1, "name": "Cambridge Network Solutions Somerville"}, {"count": 1, "name": "Centurylink Boston"}, {"count": 1, "name": "Centersquare Bos4 A"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Boston", "narrative_md": "# Boston Data Center Market Brief\n\nNo individual operator reports have disclosed megawatt capacity for the market, leaving total deployable power opaque. DataBank operates the largest tracked footprint with three facilities, followed by Enzu with two sites; the remaining operators each maintain single locations.\n\nThe DCPI verdict of AVOID signals material friction in power procurement pathways.\n\nDeal flow in Boston shows no recent tracked transactions.", "slug": "boston", "word_count": 224, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}