{"generated_at": "2026-11-07T09:43:24.595183+00:00", "key_stats": {"computed": "2026-11-07T08:49:31.940670+00:00", "constraint": null, "dcpi_score": 47.1, "excess": null, "facility_count": 29, "mw_reporting_count": 2, "name": "Boise", "recent_deals": [], "slug": "boise", "state": "ID", "top_operators": [{"count": 2, "name": "Unknown"}, {"count": 2, "name": ""}, {"count": 1, "name": "Centurylink Boise"}, {"count": 1, "name": "Fiberpipe"}, {"count": 1, "name": "DataSite"}], "total_mw": 20.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Boise", "narrative_md": "# Boise Data Center Market Brief\n\nBoise's tracked data center footprint spans 29 facilities totaling 20 MW across operational, under-construction, and planned sites. Three operators\u2014CenturyLink Boise, Fiberpipe, and DataSite\u2014each manage single facilities in the market. The fragmented operator base reflects a nascent market where no single entity has consolidated regional control, contrasting with hyperscaler-dominated regions.\n\nFor site developers, this means new power will be obtainable but not frictionless; grid access require active coordination with Idaho Power and potential phased interconnection schedules.\n\nNo recent deals are tracked in Boise's registry, leaving operator dynamics opaque. The three single-facility operators show no consolidation activity, merger signals, or announced expansion. Without M&A flow or announced facility transactions, it is unclear whether capacity growth will emerge from existing operator investment or new entrant acquisition of sites.\n\nTwo data center proposals on federal land south of Boise and near Shoshone are under BLM evaluation, indicating pipeline interest despite the absence of recent transaction records. Mayor Lauren McLean's data center moratorium proposal adds regulatory uncertainty to the development timeline. Whether new supply materializes will depend on whether these federal land proposals advance and whether local policy frameworks stabilize around growth.", "slug": "boise", "word_count": 284, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}