{"generated_at": "2026-11-07T09:42:03.229754+00:00", "key_stats": {"computed": "2026-11-07T08:50:15.244910+00:00", "constraint": null, "dcpi_score": 32.6, "excess": null, "facility_count": 8, "mw_reporting_count": 0, "name": "Bend", "recent_deals": [], "slug": "bend", "state": "OR", "top_operators": [{"count": 2, "name": "Fort Rock Data Center"}, {"count": 2, "name": "US Signal"}, {"count": 1, "name": ""}, {"count": 1, "name": "BendTel"}, {"count": 1, "name": "OneNeck IT Solutions LLC"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Bend", "narrative_md": "# Bend Data Center Market Brief\n\nBend hosts eight tracked facilities across four primary operators, with Fort Rock Data Center and US Signal each running two sites. The market remains fragmented with limited operator concentration\u2014no single entity dominates infrastructure planning or procurement. Recent deal activity in this market has not been tracked.\n\nTogether, these metrics suggest that securing incremental power for new builds or expansions will face material obstacles, whether through grid infrastructure limitations, utility availability windows, or interconnection backlogs. This is not a statement about market demand, but rather a quantified assessment of the practical difficulty of adding new power supply in this geography.\n\nOperator presence reflects regional consolidation patterns: Fort Rock and US Signal each maintain paired facilities, while BendTel and OneNeck IT Solutions LLC operate single sites. The operator roster suggests a mix of local and regional players rather than hyperscale entrants.\n\nPower availability will remain the primary determinant of new infrastructure timing in this market.", "slug": "bend", "word_count": 201, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}