{"generated_at": "2026-11-07T09:41:46.337540+00:00", "key_stats": {"computed": "2026-11-07T08:50:31.541490+00:00", "constraint": null, "dcpi_score": 47.3, "excess": null, "facility_count": 5, "mw_reporting_count": 0, "name": "Beaverton", "recent_deals": [], "slug": "beaverton", "state": "OR", "top_operators": [{"count": 2, "name": "Digital Fortress"}, {"count": 2, "name": "Digital Fortress, Inc"}, {"count": 1, "name": "Ziply Fiber"}], "total_mw": 0.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Beaverton", "narrative_md": "# Beaverton Data Center Market Brief\n\nBeaverton's tracked data center footprint comprises five facilities with Digital Fortress operating two sites and Ziply Fiber maintaining one, reflecting a concentrated operator base in a market where granular capacity data remains limited. No recent deals have been tracked in this market, and the single operator with two facilities suggests limited transaction activity among the tracked base.\n\nThis is not a statement about available megawatts in the region, but rather the practical difficulty of routing new power to a site. Operators considering capacity additions should expect extended timelines for power procurement agreements and grid interconnection processes.\n\nThe Beaverton market shows no recent transaction activity among its tracked facilities. The concentration of Beaverton's tracked capacity under two Digital Fortress entities and one Ziply Fiber site suggests a fragmented operator landscape. No recent deals tracked in Beaverton itself means current power and supply dynamics are being shaped by incumbent operators' existing infrastructure and utilization patterns rather than new entrants or major consolidation moves.", "slug": "beaverton", "word_count": 276, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}