{"generated_at": "2026-11-11T09:01:44.930897+00:00", "key_stats": {"computed": "2026-11-11T08:48:00.480198+00:00", "constraint": null, "dcpi_score": 27.7, "excess": null, "facility_count": 80, "mw_reporting_count": 1, "name": "Bangkok", "recent_deals": [{"buyer": "Evolution DC", "date": null, "id": "ext_734643cce6c2aa4139d2", "mw": null, "seller": null, "source_url": "https://www.datacenterdynamics.com/en/news/evolution-dc-signs-pre-lease-for-first-phase-of-bangkok-data-center-to-unnamed-hyperscaler/", "type": "lease", "value": null, "value_unit": "usd_millions"}], "slug": "bangkok", "state": "TH", "top_operators": [{"count": 4, "name": "True Internet Data Center, Thailand"}, {"count": 4, "name": "STT GDC"}, {"count": 3, "name": "ST Telemedia Global Data Centres (STT GDC)"}, {"count": 3, "name": "Symphony Communication Public Company Limited"}, {"count": 2, "name": "Internet Thailand Company Limited"}], "total_mw": 20.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Bangkok", "narrative_md": "Bangkok's data center market operates across 80 tracked facilities with a fragmented operator base led by True Internet Data Center and STT GDC, each running four and three sites respectively.\n\nTogether these scores indicate that acquiring new power allocations in Bangkok will face material headwinds: operators cannot rely on surplus capacity, and infrastructure bottlenecks will impede rapid or flexible power additions. The AVOID designation applies specifically to power procurement prospects for new or expanded operations.\n\nDeal flow shows Evolution DC recording a lease transaction in the market, though terms remain undisclosed. Operator consolidation continues regionally\u2014STT GDC maintains three Bangkok sites alongside broader Thai presence\u2014while local and regional players including Symphony Communication (three sites) and Internet Thailand Company Limited (two sites) retain meaningful portfolios.\n\nNew entrants and expansion plans will need to address power procurement as a first-order site selection and timeline challenge before deployment.", "slug": "bangkok", "word_count": 211, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}