{"generated_at": "2026-11-07T09:36:43.866343+00:00", "key_stats": {"computed": "2026-11-07T08:49:14.527358+00:00", "constraint": null, "dcpi_score": 23.5, "excess": null, "facility_count": 26, "mw_reporting_count": 1, "name": "Alpharetta", "recent_deals": [], "slug": "alpharetta", "state": "GA", "top_operators": [{"count": 8, "name": "Unknown"}, {"count": 7, "name": ""}, {"count": 2, "name": "Flexential"}, {"count": 1, "name": "Ascent"}, {"count": 1, "name": "Carrier Connect"}], "total_mw": 4.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Alpharetta", "narrative_md": "# Alpharetta Data Center Market Brief\n\nAlpharetta hosts 26 tracked facilities with fragmented operator control and minimal recent transaction activity. Flexential operates two sites, while Ascent and Carrier Connect each hold single facilities. The market shows low deal velocity; no recent transactions have been recorded in the tracking window. Carrier Connect leases a 4 MW facility\u2014a converted former GE property held by Mapletree\u2014which the operator secured immediately upon site takeover, signaling rapid tenant placement but not market expansion.\n\nTogether, these scores indicate that new colocation, lease or build projects will face headwinds acquiring dedicated power allocations.\n\nOperator landscape remains thin. Flexential's two-facility footprint and Carrier Connect's recent single-facility lease represent the only named activity. The absence of megawatt-scale deals or multi-site operator expansion suggests Alpharetta remains a secondary market in the regional Atlanta hierarchy. The regional context shows that larger-scale development\u2014such as gigawatt-class projects\u2014has been withdrawn in favor of alternative uses, and peer markets like Douglasville (270 MW across 11 sites) command more concentrated operator attention and deal flow.\n\nPower availability will continue to define project feasibility in Alpharetta through 2026 and beyond.", "slug": "alpharetta", "word_count": 287, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}