{"generated_at": "2026-11-07T09:36:20.452113+00:00", "key_stats": {"computed": "2026-11-07T08:49:44.010834+00:00", "constraint": null, "dcpi_score": 48.5, "excess": null, "facility_count": 23, "mw_reporting_count": 5, "name": "Albany", "recent_deals": [], "slug": "albany", "state": "NY", "top_operators": [{"count": 4, "name": "Vantage"}, {"count": 3, "name": "Unknown"}, {"count": 3, "name": "INOC, LLC"}, {"count": 1, "name": "Firstlight Albany"}, {"count": 1, "name": "IBM Building"}], "total_mw": 6100.0, "verdict": "CAUTION"}, "model": "claude-haiku-4-5", "name": "Albany", "narrative_md": "# Albany Data Center Market Brief\n\nAlbany's tracked portfolio spans 23 facilities totaling 6,100 MW across operational, under-construction, and planned sites. Vantage leads with four locations, followed by INOC, LLC with three sites. The market has not recorded recent deal activity in the tracked dataset.\n\nThe DCPI verdict of CAUTION reflects tension between these two forces. This is not a market where power flows freely to new entrants; it is one where available supply exists but requires deliberate infrastructure work to reach it.\n\nOperator concentration is evident. Vantage's four-site footprint represents the single largest presence, while INOC, LLC's three locations and smaller holdings by Firstlight Albany and IBM Building round out the tracked base. The absence of recent deals in the dataset does not indicate market stagnation\u2014it reflects the current state of recorded transaction activity. Regional interest in Albany has been documented: the proposed Kenwood Commons facility drew community attention, and the broader Northeast has seen acquisitions and capital moves by large platforms, though these do not appear in Albany's own deal log.\n\nForward momentum depends on whether operators can route incremental power capacity to their sites within timeframes that match project schedules.", "slug": "albany", "word_count": 274, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}